- Select the Work with structures menu item.
- On the initial panel, select the applicable item and click Change oper.
- You access Structure maintenance, Bill of routing, op times in minutes (or decimals). (Note: By default, the system displays the operation times in minutes. If you click Minutes/Decimals, the operation times will be displayed in decimals). Select the operation you want to change and click Change. (Note: You can also choose to copy operations, delete operations and add operations to the bill of routing from this panel).
- On the Structure maintenance, Bill of routing, op times in minutes (decimals) detail panel you can change all fields except the following:
- Item
- Warehouse
- Structure unit
- Variant
- Structure quantity
- Operation number
Click OK when you have completed the changes and then exit the routine.
Related topics
- About setting up item structures for produced items
- Set up a bill of material for a produced item
- Set up a bill of routing for a produced item
- Copy an item structure
- Change a bill of material
- Define by-products in a bill of material
- Renumber bill of materials and bill of routings
- Mass-update an item structure
- Define conformity criteria for an item structure
- Define quality control values for an item structure
- Define alternative products for an item structure
- Delete an item structure