Set up a bill of routing for a produced item

Related topics

  1. Select the Work with structures menu item.
  2. On the initial panel you have the following options:
    • Click Add to add a new item structure if no record exists for the item in the list.
    • If the item exists in the list, select the item and click Change or Change oper.

    For this task, select the item and click Change. (Note: If you click Change oper you will access the Structure maintenance, Bill of routing panel directly).

  3. You access Work with structures, Structure header. Complete the following fields:
  4. Item
    Enter an item for which you wish to create an item structure. Note: The item you enter must be defined in the Item file as item type 1 (end product), 2 (sub-assembly) or 8 (budget item).
    Warehouse
    Note: This field is only displayed when Whs in BOM is set to YES in the MFG control file. If this field is displayed, enter a unique warehouse for this item structure.

    If the STKOWNER (Stock Ownership) function is activated in the Function control file, the warehouse entered must be classified as a normal or trade (logical) warehouse (i.e. the Warehouse characteristic flag in Work with warehouses must be set to 1 (normal) or 2 (trade). See About the stock ownership functionality for more information.

    Variant
    Note: This field is only displayed when Variant handling is set to YES in the MFG control file. If this field is displayed, enter the variant of the item. An item can have several variants, where parts of the bill of material and/or bill of routing differ from the base structure. The base structure always has variant 000. The base structure is used in basic data product costing as the structure to update cost price in the Item file or in the Item/Warehouse file. It is also used in the MRP function for making the structure explosion when creating order proposals.
    Structure quantity
    Enter a quantity indicating the relationship between the structure quantity and the component quantities/operation times. The base structure quantity is 1. The structure quantity can be used to adjust component quantities in order to avoid decimals in the bill of material. Note: This field must be numeric with three decimal places. It only contains positive values.
    Maintenance option
    Indicate what is to be created in the item structure by ticking one of the following: Material, Operations/Item criteria, Alternative/co-product, Header text or No maintenance. For this task, tick Operations.

    Note: You can also enter Structure unit for the item as an alternative unit.

    Click OK.

  5. You access Structure maintenance, Bill of routing, op times in minutes (or decimals). (Note: By default, the system displays the operation times in minutes. If you click Minutes/Decimals, the operation times will be displayed in decimals). Complete the following fields:
  6. Op no
    Enter a number within a 10-interval sequence indicating the order of the operations.
    Description
    Enter a description of the operation.
    Work centre
    Enter the code for the work centre where the operation is performed.

    See the Panel help for details about the remaining fields. You can enter several operations at the same time. Click OK when you have completed the fields.

    The system updates the information and clears the panel. Click Back to view the added operations.

    • If you want to add more operations to the bill of routing, click Add.
    • If you want to add more detailed information to the operation, click Add detail.
    • If you want to maintain alternative/co-products for the selected item, click Alt product.