From this panel you can select which R/F batch to process. The batches are displayed in order of priority. All open batches assigned to the handler, which is shown in the header, are listed first.
R/F batches are displayed in the R/F priority sequence, e.g., for replenishment batches the high priority can be the automatic replenishment created when location hit the replenishment level and the lower priority batches can be manually created batches.
Those R/F batches with an asterisk (*) have been assigned to the handler and cannot be selected by anyone else. When an R/F batch has been selected, it will be held for other handlers. The R/F batch will only be released for other handlers to complete, if no picks were done.
If the handler completes any instructions, this R/F batch will be considered as assigned. Information about handler and resource will be updated on the Control information panel in Work with R/F instructions. Note: Batches that are assigned to a resource group are only displayed if the allocated resource is assigned to the same resource group.
Function keys
| Info | Display the function keys that are available for the activity. |
| Create R/F batch | Only shown if the current activity is either Put or Location movement. Create an unassigned R/F batch and assign it to the active handler. |
| Allocate resource | Access a panel displaying all available resources for the handler and the warehouse. Select the applicable resource available for carrying out the R/F batch. Or, change the resource that the R/F operator is currently working with. |
| Release R/F batch | Release the assigned R/F batch. The released batch is then available for another R/F operator to select. |
Activity line
Below the activity line, the active task is indicated and explained. Select the R/F batch that you want to process. Five columns exist and they show the following information from left to right:
- Prio
- Displays the priority of the R/F batch. Valid values range from 1 through 99999, where 1 is the highest priority.
- Sts
- This is the current status of the R/F batch header.
Instruction status codes are system defined codes used during Radio Frequency processing. The status code indicates the current step in the process for the instruction.
- Batch
- This is the system assigned R/F batch number.
- R/F resource
- This is the resource assigned for the R/F batch. It is assigned during R/F batch creation and indicates that this batch must be processed using this specific R/F resource.
- R/F batch rule
- If a batch rule was used during R/F batch creation, then the rule identity will be shown.
Display function keys (RFHD8014)
Display function keys
Below the activity line, the function keys that are available for the activity are displayed.
Function keys
| Info | Return to the R/F selection panel. |
| Allocate resource | Access a panel displaying all available resources for the handler and the warehouse. Select the applicable resource available for carrying out the R/F batch. |
| Release resource | Release the resource that is active for the handler. The released resource is then available for all R/F operators to select. |