1. Home
  2. /
  3. Panel Help
  4. /
  5. Project
  6. /
  7. Structures enquiry (POM260A)

Structures enquiry (POM260A)

Related topics

The purpose of this program is to start project/quotation material and operation structure enquiry.

Function keys

Product costing View the product costing of the project/quotation structure.
Customer
Project/Quotation no
Status
The code indicates the status of the project/quotation.

Valid codes are:

Phase
Line number
Item
The item that is retrieved from the assembly line.
Quantity
The quantity of the line.
Selection
The code indicates the type of enquiry to be started.

Valid codes are:

Code Description
1 Material structure enquiry
2 Operations enquiry