1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Routing history enquiry (PRO206C)

Routing history enquiry (PRO206C)

On this panel you can view routing historical data for a specific work centre. All routing history transactions are displayed, sorted in sequence by Work centre.

Options

M-order history Select this option to view manufacturing order historical data.

Function keys

Shift sequence Toggle to view the information sorted by period instead of by work centre.

Selection fields

Work centre
The work centre where the operation was performed.
Description
The description of the work centre.
Period
The period for which routing data exists.
Order number
Oper
Diff amount and Diff % amount
The difference in amount and percentage between the product costing and the cost control amount.
Diff run/labour time and Diff % run/labour time
The difference in time and percentage between the planned and reported run/labour time.
Diff machine time and Diff % machine time
The difference in time and percentage between the planned and reported machine time.
Diff int setup time and Diff % int setup time
The difference in time and percentage between the planned and reported set-up internal time.
Diff ext setup time and Diff % ext setup time
The difference in time and percentage between the planned and reported set-up external time.