On this panel you can view material lines that are related to the product costing calculation concerning quantities and costs.
- Item
- Cost period
- The period on the product costing. If the period is 000000, this means that it is the current product costing.
- Warehouse
- Variant
- Cost type
- The description indicates if the product costing is current, future or a simulation costing type.
- Struct quant
- Price type
- The prices used for the product costing.
- Std quant PC
- The quantity used when the product costing was performed.
- Struct unit
- Seq no
- Component
- The code that identifies the item that is included as a component in the bill of material.
- Variant
- Quantity
- The quantity in stock unit, in up to 3 decimal, of components included in the bill of material.
- Comp unit
- Displays the unit for the component.
- Set-up qty
- The fixed set-up quantity for materials. This set-up quantity can be deemed as an estimated reservation that you plan on consuming for the machine set-up before real production, and is independent of the order’s quantity. When manufacturing orders are entered, the components required quantity is calculated as follows: order quantity x component quantity + fixed set-up quantity.
Example:
Fixed set-up quantity = 10
Order quantity = 5
Component quantity = 1
Component required quantity = 15
- Waste pct
- The percentage indicates how many extra items must be produced due to production waste. The value is used to re-calculate the structure amounts during the reservation and picking for the manufacturing order.
- Line amount
- The calculated cost for actual component.