1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Work with cost models,...

Work with cost models, Elements (BAS040C)

The purpose of this program is to define the presentation of the cost model elements in sequence order.

Options

Equation Select this option to maintain equations connected to an element.
Element
The element sequence number that indicates the order in which the cost model will be presented.
Description
The description of the presentation element.
Cost/Contribution
The code indicates what type of cost the element includes. This field is used to summarise the standard cost price. All element lines with cost and contribution type set to 1 are used to calculated standard cost price.

Valid codes are:

Code Description
1 Included in standard cost
2 User defined
3 User defined
5 Summarise line